Tulbula Graphite Mine

Prospecting License was granted on the Tulbula deposit in Q4 2014. Drilling plan has been submitted to the Indian Bureau of Mines and Drilling is expected to commence in July 2016. A total of 350-400 m of core drilling is planned. Tulbula mine is a past producing property. The graphite is high grade deposit with 10% TGC on average. The material can be easily upgraded to 96% TGC through simple flotation. More information coming soon.